|
|
Construction of a portion of the $730 million, 12.5 mile extension of I-355 between I-55 and I-80.
- Construction of a new mainline Open Road Tolling (ORT) Plaza for Plaza 99 at M.P. 3.25, North of Bruce Road and South of 167th Street, including:
- Three ORT lanes and three cash lanes in each direction
- New control and annex buildings with walkway
- New Illinois State Police Sub Station
- Overhead toll collection structure, toll booths, loop detectors and I-PASS equipment
- Pavement markings
- Construction of Ramp Toll Collection plazas at eight locations; two at 127th Street, two at IL Route 171, two at IL Route 7 and two at US Route 6, each consisting of one I-PASS lane and one cash lane.
- Construction of maintenance facility at mainline Open Road Tolling Plaza.
- Installation of four overhead dynamic message signs providing instantaneous travel info.
- Installation of a video surveillance system and "real time" traffic monitoring system for the entire 12.5 mile Tollway extension.
Joint Venture with JF Edwards Construction Company Completion: October, 2007 Value: $31,000,000
Illinois State Toll Highway Authority (ISTHA)
Bollinger Lach & Associates Inc. Itasca, IL
|