 |
 |
 |
|
|
 |
 |
 |
 | |
| Type | General Contract |
| Bid Date | 07/29/2010 |
| Bid Time | 4:30 PM |
| Architect/Engineer | Primera |
| Project Location | Fermilab National Accelerator Laboratory campus, DuPage County, IL |
| Description | Construction is to include all labor, materials, equipment, transportation and supervision necessary to construct the CRYO Module Test Facility (CMTF), comprised of the Testing Area and Compressor Area, with a connecting link between the two (2) buildings and associated site improvements, including but not limited to, erection of an approximately 43 feet wide X 123 feet long X 21 feet high Compressor Area and a Testing Area with high bay, approximately 67 feet wide X 220 feet long X 34 feet high, with an additional side bay and mezzanine, all constructed on a structural steel metal frame with metal siding on reinforced concrete walls on piers on spread footings, with a concrete slab on grade, topped with a built-up roofing system on a tapered insulated metal deck. |
| Owner Name | U.S. Government |
| Plan Availability | To obtain bidding documents, please contact:
IHC Construction Companies LLC
Attn: Jennifer Rakow
jrakow@ihcconstruction.com
Phone: 847-742-1516
Fax: 847-742-6610 |
| Prospective Bidder Notes | Amendment B (7/22/10)- BID DATE EXTENDED
Amendment C (7/23/10) |
|
|
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
Copyright © 2010 IHC Construction Companies LLC |
 |
 |
 |
|
|
 |