|
|
- New Raw Wastewater Pumping Station and Appurtenant Facilities
- Design Capacity of 600 million gallons per day.
- New Screen Building containing five 10-foot wide screen channels, mechanically cleaned screens and three conveyor belts.
- New Pump Buildng contains 6 raw sewage pumps with 1500 HP motors and both 64" and 96" discharge piping and valves, new control rooms, locker rooms and showers.
- Both buildings are framed in reinforced concrete with precast concrete wall panels and roof, and include architectural, mechanical and electrical systems.
- New roads, walks, site grading and finishing, and site utilities to the new buildings.
April 2010, $120.9 million (IHC Construction/FHP Tectonics, JV)
Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) Chicago, IL
Metcalf & Eddy
|